EU-Eastern and Southern Africa States Interim EPA
Manufacture in which: - all the materials used are classified within a heading other than that of the product and - the value of all the materials used does not exceed 50% of the ex-works price of the product.
50% ex-worksManufacture by thermal or electrolytic treatment from unalloyed aluminium or waste and scrap of aluminium.